EV CHARGERS PERMIT DRAWINGS
AHJ-READY PERMIT PLAN SETS — CREATE IN MINUTES, NOT DAYS
Simplify your EV charging station projects
At ELDAPRO, we provide automated EV charging station permit drawings that streamline the design and approval process. Whether you’re an engineer, contractor, EV charger manufacturer, distributor or the owner, our platform lets you generate detailed, code-compliant permit drawings tailored to your project — then export them as PDF, SVG, or DXF, ready to submit to your local AHJ (Authority Having Jurisdiction).
What are EV charging station permit drawings?
EV charging station permit drawings are the technical documents your local AHJ requires to approve an EV charger installation. A complete plan set covers the station’s electrical design, site layout, load calculations, and compliance with the National Electrical Code (NEC) edition your jurisdiction has adopted.

What’s included in every EV charging permit plan set
- Site plan with charger locations and electrical routing
- Service entrance and feeder load calculations
- Panel schedules (existing and proposed)
- Electrical one-line (single-line) diagram
- Cable and conduit sizing with voltage-drop and short-circuit calculations
- Equipment specifications and installation details
- General notes citing your adopted NEC edition (NEC 2023 or NEC 2020)
- Export-ready output in PDF, SVG, and DXF
Three ways to get permit-ready
1. Do it yourself
Generate complete, code-compliant EV charging permit drawings yourself in minutes — no AutoCAD, no drafting, no per-project fees. Equipment, cables, and conduits are sized automatically to your selected NEC edition.
2. Add a licensed-PE review
Have our engineer review your project entries and provide recommendations so your drawings conform to all applicable codes before you submit. Available from $300, with turnaround as fast as one business day.
3. Complete PE-stamped design
Our licensed Professional Engineer designs the electrical system to meet all applicable codes and delivers Ready-for-Permit drawings with a PE stamp — available in all 50 states, starting at $2,000.
Why choose ELDAPRO for your permit drawings?
Automation for speed & accuracy: generate permit drawings that comply with your AHJ’s adopted NEC edition, so submissions are accurate and efficient.
Customizable templates: adapt our EV charging station permit drawing templates to specific project requirements without starting from scratch.
Streamlined collaboration: work with your team in the cloud — easy revisions and updates keep engineers, contractors, and reviewers in sync.
Features of our software

1
Electrical layouts & site plans
Generate detailed electrical layouts and site plans covering everything from cable and conduit schedules to power supply locations and the one-line diagram.

2
Code compliance to your NEC edition
Automatically size equipment, cables, and conduits to the NEC edition your AHJ has adopted (NEC 2023 or NEC 2020), with the code reference printed in your drawing general notes.

3
Seamless integration with documentation
Integrate easily with other project documents such as cost estimates, equipment lists, and vendor specifications, keeping all information centrally located.

4
Receive and compare bids right in the app
In ELDAPRO you can send an RFQ (request for quotation) right from the app. Vendors send proposals you can instantly compare to pick the right equipment within budget.
EV charging projects we support
Commercial charging
Multi-charger sites, workplace and retail locations, and parking facilities with full electrical distribution design.
DC fast charging
High-power DC fast charger layouts with the upstream gear, cabinets, and protection sized automatically.
Fleet & depot charging
Depot-scale charging with multiple gears chained across the power distribution system for fleet operators.
EV charging permit FAQs
What’s required for an EV charging station permit?
Most AHJs require a site plan, load calculations, panel schedules, a one-line diagram, and equipment specifications, all compliant with the adopted NEC edition. ELDAPRO produces each of these in a single plan set.
How do I apply for an EV charging station permit?
Prepare a code-compliant plan set, then submit it to your local building department or AHJ. With ELDAPRO you generate the full set, export it as PDF, and submit — and you can add a PE stamp when your jurisdiction requires one.
Do EV charging permit drawings need a PE stamp?
Many commercial and multi-family projects require engineer-stamped plans. ELDAPRO offers complete PE-stamped designs in all 50 states as an optional service.
Which NEC edition do the drawings follow?
You choose the edition your AHJ has adopted — NEC 2023 or NEC 2020 — and ELDAPRO sizes the design to it and prints the reference in your drawing general notes.
Ready to simplify your EV charging station permit drawings?
Sign up today and discover how ELDAPRO can help you stay ahead of the competition with fast, reliable, and accurate documentation.
Drop an email to info@eldapro.com or contact us through the website to get started. Get your project ready today!